Notice: Undefined index: Kapak in /home/yp/public_html/proje.php on line 79
LOFT DRAGOS projesi fiyatları LOFT DRAGOS projesi nerede adres, telefon ve e-posta bilgileri

LOFT DRAGOS

Projeyi Takip Et
DRAGOS KARTAL / İSTANBUL Anadolu Yakası
Konut Sayısı : 100
Konut Seçenekleri : 1+1, 2+1, 3+1
Metrekare Aralığı : 73.00 - 153.00
Teslim Tarihi : 2016-05-15
Fiyat Aralığı : 300000 - 930000
ERGUVAN İNŞAATERGUVAN İNŞAAT PROJELERİ İÇİN TIKLAYIN
DEMİRBAŞ YAPIDEMİRBAŞ YAPI PROJELERİ İÇİN TIKLAYIN

Notice: Undefined index: Kapak in /home/yp/public_html/proje.php on line 199
(Translated with google translate)
 
The project will be implemented in the Loft of Dragos Dragos 100 residential and commercial units to 350 square meters of fields 1.

4 thousand 500 square meters land area over 15 thousand square meters of construction area
project; the different types of fields to 74 square meters, 1 + 1, with 123 square meters of fields ranging from 109 2 + 1 and 3 + 1 with 150 square meters of housing types fields. Ranging from 13 to 18 square meters of houses in the project areas include large balconies.

55 feet tall, 18-storey single-block housing in the ceiling height of 3 metres from the project, as designed.

TECHNICAL SPECIFICATION

1-the Foundation of reinforced concrete: studies on the ground will be needed after anyone finds out fore-pile system. Then, after pouring the base slab layer and water at the appropriate level of the section 2 press file reinforced WEBER, KÖSTER or equivalent brand liquid membrane and geotextile felts, 150gr/m2 after applying the protection covering or drainage plate with the forces.

The drainage system at the city level, according to the network will be set up in every facet of the Foundation drainage system charge. There will be links to the necessary drainage of rain water channels. The accumulation of water around the building will be prevented.

A-level examination will be taken in this pit, the pit in the basement a bad sample lab report will be prepared on the ground by keeping the test Study koşularında.Geotechnical report İstanbul Metropolitan Municipalities will be held by the hand of the authorized companies and Pendik approval of geological engineers and Geophysics Engineers Chamber onaylattırılacaktır.

B-Building concrete prepared by the Ministry of public works and settlement of static project TC "disaster will be held in parts of structures about directing" will be prepared in accordance with the provisions of.

2-concrete quality: C 30 and C 35 ready mixed concrete will be used. (Noah, Lafarge, H, Concrete, Concrete brands), within the framework of the law, each 7-day building control betonumuzdan, 14-day, 28-day will be 3 for use in the Crimean test sample. A negative case contractor manufacturing and will solve the negativity.

3-rough construction Detail: construction of Buildings certified as suitable for the project and the Ministry of public works in accordance with the General technical specifications of attachments, so definitely there will be a first class workmanship riayetle. As a light brick as the aerated concrete light floor tiles floor tiles or equivalent will be used. Exterior walls 13.5-15 cm 8,5 13,5 cm or as needed internal walls-10 cm concrete or brick will be used. According to the project concept will be applied to the roof or terrace. The roof terrace will be sound and heat insulation.

4-isolation: apply to the basic bundling system, insulation, perlite plaster isolation will help. There will be areas of paint, Marshall, Filli paint, Blue Castle Dow, Polisan, Baumit or equivalent brand insulation package will be used. Building drenajlarından by use of concrete slab layer above 14 C after class after the required insulation rail base will begin to manufacture.The building will be drained of water drainage and soil level around the waters connecting drain rain water channel, will be.

5-water tank: in accordance with the number of Apartment Buildings may be closed according to the suitability of the water cubic meter tanks. Pressure tank as would be standard or equivalent brand Baymak, Willo.

6-Indoor garage: car park floor epoxy coating or colored concrete with hardener, or equivalent shall be made on the ground. Shall be made with the garage lighting sensor lighting. Car park gate with remote control. The parking lot will be the fire extinguishing system.

7-Shelter designated by the Ministry of public works and settlement: T C qualifications based on the number of total building area and will be the appropriate shelter specifications circle

8-building entrance: Building a first-class coated steel door entries or equivalent and building entrance halls of architectural design is suitable for travertine, granite, granitseramik, covered with marble or 1st class counterpart coating and the walls of the building entry imported paints and wallpapers or equivalent with the visuals will.Building entrances T.s.e. certificate 1. class will reach up to the top floor lifts are closed parking area.

9-joinery systems: Pimapen, Winsa, Rehau or counterpart brand series of Wells Fargo, will be used.Glass glazing TSE 4x16x4.

10-Ceramics: apartment, Hall, kitchen, Kütahya, Çanakkale, Vitra, soft marble or Mosaic Center or equivalent brand ceramics will be used. Lounge and rooms 1st class domestic laminate flooring or equivalent will be used.

11-Plumbing and gas Installations: plumbing, Fan Design or equivalent brand conduit shall be used. All of the counters will be furnished by the contractor.Kitchens-stove, electric or natural gas line, gas line will also be retiring the system Under the new regulations building kalo

LOFT DRAGOS İle İlgili Haberler

Aynı Bölgedeki Diğer Projeler


Warning: fopen(/var/www/vhosts/yeniprojeler.com/httpdocs/cacheyeni/httpswwwyeniprojelercomistanbul-anadolu-yakasikartal-dragosyeni-konut-projelerierguvan-insaat-demirbas-yapi-loft-dragos): failed to open stream: Böyle bir dosya ya da dizin yok in /home/yp/public_html/proje.php on line 449

Warning: fwrite() expects parameter 1 to be resource, boolean given in /home/yp/public_html/proje.php on line 450

Warning: fclose() expects parameter 1 to be resource, boolean given in /home/yp/public_html/proje.php on line 451